The Kendal Flood Scheme - Offer of Consultation
last updated: 20 July 2021The Society has recently been asked by the Environment Agency to enter into what may prove to be fairly detailed discussions about aspects of the Kendal Flood Scheme, in particular some of the details of the proposals in the Conservation Area. We welcome this opportunity to comment in a meaningful way, but the committee felt that we should in the same breath, so to speak, make our position quite clear about the scheme as a whole.
The Kendal Civic Society has always been strongly opposed to this scheme and we raised our objections at the time of the planning application. We have not changed our minds on this.
In making our formal objections, we acted hand in hand with the Friends of the Lake District and Historic England and many other organisations. We still believe that the current scheme is fundamentally flawed - that common sense as well as the environmental science dictated that the upstream measures should be carried out first and that the impact of these be incorporated into the computer modelling which is driving the design of the walls and engineering works in Kendal. We believe that this would very likely have meant a less intrusive, more environmentally friendly solution. We have noted with interest the recent (June 2021) apparent change of heart by the Environment Agency as regards ‘concrete’ flood defences (as reported in the press) and their new focus on ‘nature based solutions’. This would in our view have been the correct way to proceed in Kendal and it would perhaps have resulted in a scheme that was more likely to prevent another Storm Desmond flood, something that the current scheme does not do. It might also have avoided the felling of so many beautiful mature trees and the brutal engineering works in the heart of the town which will enclose the river and destroy the open aspect of the riverside. Instead, here in Kendal, the Environment Agency with the support of SLDC has pressed forward simply in order to meet an arbitrary funding deadline. Kendal may be one of the last schemes in the country to be approached in this way, something that will, we feel, be a long term source of regret.
We do, however, accept that this argument has been lost.
Now that physical work is commencing our intention is to try to mitigate the worst aspects of the scheme and try to ensure that less damaging options are taken if possible in the Conservation Area. In this, we do welcome the recent approach by the Agency. We are not, of course, a statutory consultee and to date our responses have been limited to making specific comments on aspects of the scheme as details have been published through the planning process. This we have done. This recent offer of consultation may give us a better opportunity to influence the designs as they develop. They may at least allow us to address one of our main concerns - namely the way in which the detailed design of the interventions in the Conservation Area is apparently being decided at present. We are, frankly, not confident that the process is in the hands of designers with the appropriate insight, skill and authority to handle the design in this highly sensitive environment, despite best intentions. Alteration work in Conservation Areas requires particular sensitivity and understanding but it seems to us that this scheme is still led, as it has always been, by the flood engineers who have other priorities.
The list of design issues for discussion is quite a long one - the specification of the new stonework and particularly the related details such as the copings; the final details of the new railings and how the important existing Webster railings and Rishton railings are incorporated; the details of how the existing stone will be re-used; the improvement of the ugly glazed screens; the details of the ground surfaces; the details of how the existing features such as the laundry steps and the fountain will be incorporated; the details of the new bridge landing areas; the design and selection of the street furniture; the design of the artificial lighting and the commissioning and installation of the promised works of art.
It is probably too late to stop this dreadful scheme in its tracks even despite the recent apparent change of heart by the Agency - our preferred course of action - but if anything can be done even at this late stage to improve the quality of the details we will be pleased to make our contribution.