SL/2021/0710 - Land adjacent to Rivers Mint and Kent

last updated: 30 August 2021

Land adjacent to Rivers Mint and Kent extending from adjacent to Lakeland Distribution Centre to Helsington Mills KENDAL: Application for a non-material amendment following a grant of planning permission SL/2018/0925 Kendal Flood Risk Management Scheme - Phase 1 Kendal Linear Defences, comprising works along the rivers Kent and Mint through Kendal including new and raised flood walls, new and raised flood embankments, ground raising, pumping station and associated changes to the public realm and landscaping.

Object: We welcome the alterations to the access arrangements to the stone arch between the church and the parish hall as now proposed, this seems like a sensible improvement to that previously proposed. Similarly, we welcome the raising of the coping stones immediately adjacent to the Kirkland footpath, so they are more obviously associated with a wall as they were originally, rather than appearing as a curb as now. Obviously, we also welcome changes that reduce damage to existing trees and improve chances of retaining as many as possible of the good quality ones.

However, we do have concerns about the proposed ramped access from Kirkland, particularly about the elevated railings introduced by this change and the potential for further disconnection with the river when viewed from Kirkland. The supporting elevations are not adequate to assess what effect the railings will have on views of the river and it would appear that more railings are proposed than are justified by changes of level. There is no consideration of other measures such as changes to adjacent ground levels to reduce the need for intrusive railings, particularly where they are such a utilitarian design. A visualisation should be simple to prepare from engineering drawings already produced and photographs to aid interpretation. If there was no increased adverse impact or this amendment was considered a visual improvement, we would have expected this to have been presented to support this proposal. We do not consider that the additional impact of these railings has been addressed in the supporting statement.